The Challenge
Tight Deadlines, No Room for Error
Due to 3M’s special release criteria for aircraft film, the material couldn’t be shipped until specific conditions were met — leaving the team with virtually no margin for error once it arrived. There was no extra material and no time for reprints.
This high-profile project came with a non-negotiable launch date and limited resources. With no access to exact aircraft measurements, no backup materials, and an install window that ran from 5 a.m. to nearly midnight, everything had to be flawless on the first try.